top of page

Australia's biggest wind turbine blades trucked 530km to far west NSW wind farm

  • Dec 9, 2017
  • 1 min read

The blades for the Silverton wind farm are carried along the Barrier Highway from Adelaide.

Comments


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page